Case Studies

Real world experience is everything and we know how important it is to have the confidence that the benefits of our technology we tout is not just lip service.  Below is just a sampling of some of our actual results and the clients who entrust us to provide them with the data they need.

Eagle Ford Basin,
Zavala County, TX

Real-Time Fracture Measurement Enables Operator to Reduce Stage Time and Fluid Usage while Increasing 120-Day Production by 18%.

Montney Basin,
Wembley, AB

Montney Operator Reduces Well Completion Cost by $125,000 while Achieving a Production Uplift of 18% Over Offset Type Curve.

Midland Basin,
Midland County, TX

Completion Optimization Technology Results in 17% Uplift in Cumulative Production for In-Fill Child wells in the Midland Basin.

Delaware Basin,
Reeves County, TX

Top Performers in Their Field – Long Term Production shows ShearFRAC® Completed Wells Outperforming Offset P-50 by 43%.

Haynesville Basin,
Red River Parish, LA

First Order Child Well Pair Outperform Unbounded Second Order Child Well Pair by 18% in 180-Day Cumulative Gas Production.

Western Gulf Basin,
Webb County, TX

Real-Time FDI Mitigation Workflow Enables Operator to Increase Stage Placement by 63% Resulting in a 25% Uplift in Production.

Midland Basin,
South Texas, TX

Richter Predictor allows Permian Operator to Detect Fault Activity during Completions prior to Seismic Event.

WCSB Basin,
Blueberry, BC

Prediction of a 4.6M Induced Seismicity Event: Utilizing the Richter Predictor® for Proactive Seismic Monitoring

Delaware Basin,
Reeves County, TX

Streamlining Completions in H2S Prone Geohazard Zones with
Advanced Fracture Frequency Measurements

Delaware Basin,
Lea County, NM

25% Child Well Cumulative Production Increase with Enhanced Workflow for Integrating Stage-Level PFPD and Offset Measurements

Image placeholder