Request For Case Study Select Case Study From List Below Real-Time FDI Mitigation Workflow Enables Operator to Increase Stage Placement by 63 Increase in ProductionMontney Basin - Montney Operator Reduces Well Completion Cost by $125,000 while Achieving a Production Uplift of 18% Over Offset Type CurveMidland Basin - Completion Optimization Technology Results in 17% Uplift in Cumulative Production for In-Fill Child wells in the Midland BasinHaynesville Basin - First Order Child Well Pair Outperform Unbounded Second Order Child Well Pair by 18% in 180-Day Cumulative Gas ProductionEagle Ford Basin - Real-Time Fracture Measurement Enables Operator to Reduce Stage Time and Fluid Usage while Increasing 120-Day Production by 18%Delaware Basin - Top Performers in Their Field – Long Term Production shows ShearFRAC® Completed Wells Outperforming Offset P-50 by 43% Δ